Commissioned by Beck Interiors, Armour Systems technical team integrated all the showcase products within the setworks. Special cases included an asymmetrical structure over 8 metres in length, 4 metres deep, and 3 metres high, with integral lighting and environmental conditioning. The project was completed within a five-month period including installation.