Scope:
106 x 6 car train sets for 95TS (Northern line) – 636 cars
Project commenced Q1:2013 with completion during Q2:2015
63 x 7 car train sets for 95TS (Northern line) – 441 cars
Project commenced Q4:2016 with completion during Q1:2019
Designed by PLP in-house engineering team
Cab area flooring added to the scope i.e. as well as the saloon areas
Modular system designed to permit individual panel lift in the event of needing to access piping, electrics etc. situated under the floor thus providing a significant time (and material cost) saving for such maintenance activities
Technically compliant to applicable LUL standards and specifications
Materials sourced by PLP
End product manufactured by PLP
Assisting with first vehicle fit on-site at TfL depots
Other products being supplied as part of the contract include wheelchair area partitions, internal and external sill plates and all applicable tooling